My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-20_REVISION - M2004009 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004009
>
2012-07-20_REVISION - M2004009 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:12:00 PM
Creation date
7/23/2012 3:45:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
REVISION
Doc Date
7/20/2012
Doc Name
NEW AMENDMENT
From
WSI WEILAND
To
DRMS
Type & Sequence
AM2
Email Name
ECS
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E — Reclamation Plan <br />imazapyr or <br />triclopyr <br />To perimeters of cut stems immediately <br />after cutting <br />Sources: Colorado Natural Areas Program. 2000. Creating an Integrated Weed Management Plan. <br />http: / /parks.state.co.us /cnap, and Colorado State University Cooperative Extension. No date. <br />Weed Management for Small Rural Acreages. No. 3.106. <br />http://www.ext.colostate.edu/PUBS/Natres/03106. h tm I <br />Alternative Reclamation Plan <br />For bonding purposes, an alternative reclamation plan would grade the 630,000 <br />yd of stockpiled shale over the surface of the mining cells in Cell 2 following <br />stripping and stockpiling of topsoil. The side slopes would be graded at 3:1 and <br />would result in an increase in ground surface elevation of 8 -9 ft. Topsoil would be <br />placed over the top of the graded shale and revegetation would be established in <br />the same manner as the primary reclamation plan. <br />Turnpike Mining Resource M- 2004 - 009 -AM -2 <br />Regular 112 Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.