Laserfiche WebLink
IGWT Mining, INC. <br />Exhibit D (Map D -2) <br />Size of Phases to be Worked <br />(see mining plan for the time which will be required for the various phases and the sequence) <br />Aqued���* <br />Columbia Ditc <br />Hector Mine Area <br />Highway <br />Map D -2 <br />Size of Phases to be Worked <br />=Phase 1- 15 acres <br />=Phase 2 -15 acres <br />=Phase 3- 16 acres <br />=Phase 4 -8 acres <br />=Phase 5 -13 acres <br />0 Phase 6- 6 acres <br />Phase 7- 8 acres <br />=Phase 8- 10 acres <br />=Phase 9- 5 acres <br />1\ <br />Highway 9 <br />Prepared by: Dustin London, EIT <br />Aqueduct <br />Columbia Ditch <br />N <br />Scale <br />1" =660' <br />December 14, 2010 <br />