My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-19_REPORT - M1981086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981086
>
2012-07-19_REPORT - M1981086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:40 PM
Creation date
7/23/2012 12:22:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981086
IBM Index Class Name
Report
Doc Date
7/19/2012
Doc Name
ANNUAL FEE/REPORT
From
NORTHERN WATER
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPT. OF PUBLIC HEALTH & ENVIROMENT <br />Water Quality Control Division <br />WQCD -P -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />Make enough copies of form for each reporting year. Or go to <br />http:/Mrww.cdphe. state. co. us4 vo/ PermitsUnit/stormwaterfindustrial html <br />Check if this is a <br />new name, address, etc. <br />Permittee (Company Name): Northern Colorado Water Conservancy District <br />Facility Name: COR- 340942 Gravel Extraction <br />Mailing Address: NCWCD — Farr Pumping Plant, P.O. Box 1617, Grand Lake, CO 80447 <br />Facility Phone Number: ( 970 ) 627 -3406 <br />Permit Certification No. COR-34 0942 <br />Reporting Period: Jan. 1 -Dec. 31, 2011 (Form is due by Feb. 15 of the following year) <br />"Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken to <br />comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements made in <br />any of your Best Management Practices (BMPs), employee training, spills, other problems encountered, etc. How <br />is your plan working ?) <br />No spills, no production, no changes to the SWMP. <br />Were changes made to your SWMP? X No. Yes — Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year — see page 8 of the permit. <br />Include here a summary of those inspections, plus any other comprenhensive inspections made. It is not <br />necessary to summarize day - today inspections, unless significant problems were noted.) <br />First Inspection — Date: May 312011 Findings, and action taken- <br />No production, no changes <br />CADocuments and Settmgsystoupalocal SettingsWernporary Internet Ffles \Content OutlooWELH5HBT12011 Report doc 09/25/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.