Laserfiche WebLink
PSCM Permit App. TOC -iv Revision 03/05/10 <br />List of Figures (continued) <br />• <br />Figure 2.04.11 -F1 <br />Winter Big Game Densities within the Combined Seneca II and Yoast Mines' <br />Big Game Survey Areas from 2000 -2007 and the Peabody Sage Creek Mine <br />Big Game Survey Area in 2009 . .......................................................... <br />2.04 -152 <br />Figure 2.05.3 -F1 <br />Typical Haulroad Cross - Section ..... ............................... ........................2.05 <br />-21 <br />Figure 2.05.3 -F2. <br />Typical Access Road Cross - Section .............................. ........................ <br />2.05 -24 <br />Figure 2.05.6 -1 <br />Modeled Initial Drawdown and Mining Sequence ........ ........................ <br />2.05 -72 <br />Figure 2.05.6 -F2.1 <br />Predicted Groundwater Inflow Rates 0 -420 Months ..... ........................2.05 <br />-74 <br />Figure 2.05.6 -F3 <br />Graph of Predicted Drawdown Resulting from Mine Dewatering ........2.05 <br />-76 <br />Figure 2.05.6 -F4 <br />Predicted Drawdown 26 Months after Start of Mine Dewatering ........2.05 <br />-77 <br />Figure 2.05.6 -F.1 <br />Predicted Drawdown 60 Months after Start of Mining ..................2.05 <br />-77.1 <br />Figure 2.05.6 -1 <br />Predicted Drawdown 420 Months after Start of Mining ................2.05 <br />-77.2 <br />PSCM Permit App. TOC -iv Revision 03/05/10 <br />