My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-08_PERMIT FILE - C2009087A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2012-06-08_PERMIT FILE - C2009087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 8:20:02 AM
Creation date
7/23/2012 9:01:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
6/8/2012
Doc Name
Table of Contents
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />U <br />�J <br />2.04.12 Prime Farmland Investigation ............ ............................... .......................2.04 -173 <br />2.04.13 Annual Reclamation Report ............... ............................... .......................2.04 -174 <br />2.05 Operation and Reclamation Plans ................................ ............................... .........................2.05 <br />-1 <br />2.05.1 <br />Objectives .............................................................. ............................... .......2.05 <br />-2 <br />2.05.2 <br />Operation Plan — Estimated Area for Life of Operation .............................. <br />2.05 -3 <br />2.05.3 <br />Operation Plan — Permit Area ............................ .......................................... <br />2.05 -7 <br />2.05.4 <br />Reclamation Plan ................................ ............................... ........................2.05 <br />-34 <br />2.05.5 <br />Postmining Land Use .......................... ............................... ........................2.05 <br />-62 <br />2.05.6 <br />Mitigation of the Impacts of Mining Operations ........ ............................... <br />2.05 -63 <br />2.05.6 (1) Air Pollution Control Plan .................................. ............................... <br />2.05 -63 <br />2.05.6 (2) Fish and Wildlife Plan ................ ............................... ........................2.05 <br />-64 <br />2.05.6 (3) Protection of Hydrologic Balance ................. ........................2.05 <br />-68 <br />2.05.6(3)(a) Protection of the Hydrologic Balance ................2.05 <br />-68 <br />2.05.6(3)(a)(iii) Probable Hydrologic Consequences <br />.... 2.05 -69 <br />2.06 Special Categories of Mining ............................................................... ............................... 2.06 -1 <br />2.06.1 Scope .................................................... ............................... .........................2.06 -1 <br />2.06.6 Prime Farmlands .................................................. ............................... .........2.06 -1 <br />2.06.7 Variances for Delay in Contemporaneous Reclamation Requirements in <br />Combined Surface and Underground Mining Operations ........................... 2.06 -1 <br />2.06.8 Surface Coal Mining and Reclamation Operations on Areas, or Adjacent to <br />Areas, Including Alluvial Valley Floors ............................. .........................2.06 -1 <br />2.06.10 Coal Processing Plants and Support Facilities Not Located Within the Permit <br />Area............................................................ ............................... ................... 2.06 -1 <br />Rule 3 - Performance Bond Requirements <br />3.01 Introduction ..................................................................................... ............................... 3.0 -1 <br />3.02 Performance Bond Requirements for Surface Coal Mining and Reclamation Operations ...3.0 -1 <br />3.02.1 General Requirements ..................................................... ............................... 3.0 -1 <br />3.02.2 Determination of Bond Amount ..................................... ............................... 3.0 -1 <br />3.02.3 Period of Liability for Performance Bond ...................... ............................... 3.0 -2 <br />3.02.4 Form, Conditions, and Terms of Performance Bonds ......... ..........................3.0 -2 <br />Rule 4 - Performance Standards <br />4.01 General Provisions ..... ............................... <br />4.01.1 Scope and Objectives........ <br />4.01.2 Authority ........................... <br />4.01.3 Responsibility ................... <br />........................................... ............................... 4.0 -1 <br />........................................... ............................... 4.0 -1 <br />................................................ ..........................4.0 -1 <br />................................................ ..........................4.0 -1 <br />PSCM Permit App. <br />TOC -ii <br />Revision 03/05/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.