Laserfiche WebLink
July 9, 2012 C -2009- 087 /Peabody Sage Creek Mine JDM <br />LL <br />PM -6 Lower End Construction <br />SCM -IA Construction <br />AL <br />PM -6 Lower End at PECOCO Pond SCM -1 at PECOCO Pond <br />GENERAL MINE PLAN COMPLANCE: <br />At the time of the inspection, topsoil salvaging and storage was ongoing in the areas of drainage construction <br />permitted under TR4. The initial mining process is ongoing with a continuous miner working to construct the four <br />portal entries at the portal site. At the time of the inspection the grouting work at the portal canopies is near <br />completion. The small conveyor from the portal to the temporary coal handling facility area is ongoing. <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 6 of 11 <br />