My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-13_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-07-13_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:36 PM
Creation date
7/19/2012 3:43:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
Revision
Doc Date
7/13/2012
Doc Name
ADEQUACY REVIEW LETTER
From
TELLURIDE STONE COMPANY
To
DRMS
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 2: TSC intends to place the backfill in the mined area such that it will be approximately up to the former <br />or existing grade that existed prior to excavating the pit. This will have a grade of 10:1 or less. TSC initially intends <br />to create a temporary berm of waste material above the original grade along the northern boundary of the TRAA <br />7:1 grading contours. This berm will be made immediately from existing waste product and former stockpiled <br />materials and is intended only to mitigate the visual impact of TSC's packaging materials and palletized stone from <br />our adjacent landowners. This berm will be placed to comply with TRAA's 7:1 grade at the point where they meet. <br />This is part of the existing pre -mined stored material that we intend to eventually use as backfill as we complete <br />our reclamation. <br />Question 3: The 2 fuel storage tanks each stand in a concrete well. All walls and the base of each concrete well <br />measure 6" thick and are completely impermeable. We also have a spill kit and a company written oil spill <br />procedure in place. This structure is the same and original well that was engineered and constructed for our <br />original 110 Mining Permit M -95 -053. <br />Question 4: The corrected mining plan map (Exhibit C) and the reclamation plan map (Exhibit F), showing the <br />surface topography, are enclosed. <br />Please let me know if you have any further questions. <br />John B. Gallegos <br />President <br />Enc: maps <br />
The URL can be used to link to this page
Your browser does not support the video tag.