Laserfiche WebLink
�p OFFICE OF SURFACE MINING <br />A k3 X r t Mine Site Evaluation <br />Jv ,, aMatc State Program <br />1. Permittee/Person J� NW ns� 9 <br />IMOUNTAIN COAL COMPANY LLC <br />2. Address <br />(CITY PLACE 1 STE 300 <br />3. City <br />1ST LOUIS <br />5. Zip Code <br />(63141 <br />7. Operator Name, if Different than Permittee <br />(MOUNTAIN COAL COMPANY LLC <br />8. Mine Name <br />6. Phone Number <br />1(800) 238 -7398 <br />4. State <br />I MO 1 <br />'WEST ELK <br />9. Permit Number <br />1C-80-007 <br />11. Field Visit Date 12. Purpose <br />16/19/2012 <br />( <br />mm -dd - <br />10B2 <br />14. Permit Status 15. Site Status <br />IA <br />1 1 <br />17. OSM Office # 18. CCID # <br />1140 <br />105 -03672 <br />1145596 <br />20. M.S.H.A. ID # 21. State Abbrev. <br />I co I <br />23. AVS Permittee Entity ID Number <br />10. Permit Type <br />I 1 <br />13. SRA Present <br />I <br />16. Facili T pe <br />19. Land Code <br />1SF I <br />22. County/Burrough <br />I GUNNISON <br />24. State Office <br />25. Hours <br />1 3.0 1 <br />1 16.0 1 <br />1 14.0 I <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />Purpose Type Codes - Item 12 <br />Oxx...Oversight <br />Axx...Assistance <br />Permit Status - Item 14 <br />A Active: Coal mining activities occumng or permitted but not yet <br />disturbed. <br />IN Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations. (Interim Program Permit): <br />Coal mining completed and reclamation activities initiated. <br />BR Bond Release: Reclamation completed and State Regulatory <br />Authonty(RA) has released all of the bond (Phase III Release). <br />Site Status - Item 15 <br />ND No Disturbance: No coal mining and reclamation <br />operations have been started. <br />EX Coal Exploration: Coal exploration operations have <br />started and where coal mining operations have not <br />begun. <br />AP Active Coal Producing: Coal surface mining <br />activities are occumng. <br />AN Active Non - Producing: Active non - producing facility <br />such as tipple or preparation plant. <br />NM No Mining: The Permit Status is active, site is not in <br />Temporary Cessation, no surface coal mining <br />activity, and site not regraded. <br />F....Loading Facility and /or Tipple <br />G....Stockpiles <br />26. Signature Block <br />Date: <br />Sign <br />Facility Type Codes - Item 16 D....Ancillary (Haulroad, Conveyor, and /or Rails <br />A...Surface E....Refuse and/or Impoundment <br />B....Underground <br />C....Preparation Plant <br />Christy Hulsman, ID #532 <br />Printed Name: <br />Permit Type - Item 10 IP = Intenm Program PP = Permanent Program NP = No Permit <br />RFx..Reclamation Fees <br />Fxx...Federal Actions <br />17/11/2012 <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector at any time dunng the review of the mine site <br />AB <br />AB1 <br />AB2 <br />AB3 <br />NA <br />MC Mining Complete. No mining activity on site, site <br />regraded and awaiting bond release <br />TC Temporary Cessation: The RA has granted <br />cessation of mining pursuant to 30 CFR <br />816/817:13(b). <br />P1 Phase I Release. At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release. <br />P2 Phase II Release: At least Phase II bond release <br />for the entire permitted area. <br />P3 Phase Ill Release: Reclamation completed and <br />the RA has released all bond. <br />27. ' eviewi <br />Signature: <br />Review Date: <br />Offi 'a1: <br />I 7-41-/A. <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used Y/N <br />CCR..Citizen Complaint Referral (non -site visit <br />CC ...Citizen Complaint (initial site visit) <br />CCF...Assistance <br />Abandoned. All surface and underground coal mining activities have ceased and operator <br />has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />Bond Forfeiture: Bond forfeiture officially in process or completed and reclamation in <br />progress or not yet commenced. <br />Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />but site not reclaimed to Program standards. <br />Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Not Applicable: When site is unpermitted. <br />NS Non -Site Visit: Status of site not determined. <br />Forfeiture Pending: The RA is pursuing actions to <br />FP revoke the permit, collect the performance bond(s), <br />and /or reclamation of forfeited site is in progress. <br />FR Forfeited and Reclaimed: Forfeiture reclamation <br />completed. <br />FO Abandoned Site: Abandoned site that is permitted but <br />there is no bond. <br />WC Wildcat Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />K....Government Financed Construction Exemption <br />H...Exploration Permits <br />I....Notice of Intent to Explore L....Remining site permitted under 30 CFR 785 25 <br />J...,Exempt 16 and 2/3 <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- 888 - 734 -3247). <br />Page 1 <br />�U <br />661 <br />gesunoct <br />