My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-19_HYDROLOGY - M1977378
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1998-10-19_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:14:49 PM
Creation date
7/18/2012 7:37:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/19/1998
Doc Name
3rd Quarter 1998 Report
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> 17 7-- 37cP <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECHO DAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> ✓OG.� -�g 1998 � <br /> October 16, 1998 <br /> Attention: Ron Zdyb <br /> Mail Code: 8D2-W-GW <br /> U.S. Environmental Protection Agency <br /> Underground Injection Control (UIC) <br /> 999 18th Street, Suite 500 <br /> Denver, CO 80202-2466 <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> A-31r'd Quarter 1998 Report (July- September) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the period <br /> from July 1, 1998, through September 30,1998. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead annual inspection was completed on July 8, 1998 and a sample of the <br /> water from behind the bulkhead was taken at this time (results are attached). The mine pool <br /> elevation was below 11,600' elevation at the time of the inspection and on September 30, 1998. <br /> Therefore, the bulkhead pressure should be 8 psi. The bulkhead and tunnel inspection did not <br /> reveal any reason for concern or give any indication that the bulkhead is not performing as <br /> designed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.