My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-07-27_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1998-07-27_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 5:47:11 PM
Creation date
7/18/2012 7:37:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
7/27/1998
Doc Name
2nd Quarter 1998 Report
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111111111111111111 <br /> 999 <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECHO DAY COMPANY A4_` f 7 7_ 3 7 F <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> RECEIVED <br /> AL270 <br /> HIV. OF MINERALS <br /> July 23, 1998 &GEOLOGY <br /> Attention: Ron Zdyb <br /> Mail Code: 8D2-W-GW <br /> U.S. Environmental Protection Agency iv <br /> Underground Injection Control (UIC) <br /> 999 18th Street, Suite 500 <br /> Denver, CO 80202-2466 <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> ,--2nd Quarter 1998 Report (April-June ) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the period <br /> from April 1, 1998, through June 30,1998. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead was inaccessible throughout the 2nd quarter of 1998. <br /> The mine pool elevation was below l 1,600' elevation on June 30, 1998 therefore, bulkhead <br /> pressure should be 8 psi. Access should be gained the first part of July and a bulkhead inspection <br /> is planned for July. A water sample will be taken from the water behind the bulkhead during this <br /> planned inspection. Results will be included in the 3rd quarter, 1998 report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.