My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-11_INSPECTION - M1977378
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977378
>
1997-11-11_INSPECTION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 9:43:42 AM
Creation date
7/18/2012 7:32:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
INSPECTION
Doc Date
11/11/1997
Doc Name
Final Inspection, Pride of the West
From
DMG
To
Sunnyside Gold Corp
Inspection Date
10/20/1997
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> STATE OF COLOMDO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources por'.4 Wi <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303) 2-810 67 DENVE � OFFICE DEPARTMENT OF <br /> FAX:(303)832-8106 B t OFFICE <br /> ATE: November 11 , 1997 PUBLIC FILE COPY NATURAL <br /> FILE: RESOURCES <br /> PTO: Larry Perino S&C ��� 3 7� Roy Romer <br /> SITE: _'�,n y ,L,6 Aq c Governor <br /> James S.Lochead <br /> WROM: Wally Erickson Executive Dire for <br /> v Michael B.Long <br /> Division Director <br /> RE: Final Ins ection, Pride of the West Tailings Project MRP, <br /> CDPS Permit No. CO-0044 68, Consent Decree and Order, <br /> Case 94 CV 5459, DMG Permit No. M-77-378. <br /> Pursuant to CDPHE WQCD request, submitted 10/20/97, DMG conducted final inspection <br /> of the Pride of the West Tailings Project MRP. <br /> Inspection Date: --/10/20/97 <br /> Individuals Present: Larry Perino, SGC <br /> Jerry Sandell, Court Appointed Receiver <br /> Wally Erickson, DMG <br /> Observations: Relocation of the mill tailings from the Pride of the West Tailings Pond <br /> appeared complete. Operator indicated that approximately 85,000 cy of pre-law tailings <br /> had been neutralized by mixing high pH materials and relocated to Mayflower Pond #4 or <br /> to the Howardsville Mill Lower Tailings Pond. An additional 15,000 cy of sand tailings <br /> had been relocated on-site for contouring. Pre-law tailings had been excavated below the <br /> existing water table and at 2H:1 V slope up to the embankment outslope for the <br /> Howardsville Mill Tailings Ponds. Under drains were installed prior to backfilling 2H:1 V <br /> slopes to. 4H:1 V. Backfilled slopes and backfilled bottom areas were graded to provide <br /> positive drainage and irregular shoreline for wetland areas. Limestone and steer manure <br /> were evident throughout reclaimed areas. Evidence of settling, slumping, erosion or <br /> instability of backfilled slopes was not observed. Reclaimed areas were mulched and <br /> seeded. <br /> An embankment had been reconstructed along the northwest side of the reclaimed area, <br /> along the previous location of the pre-law pond embankment. Purpose of the <br /> reconstructed embankment was to divert overflow from the Animas River channel away <br /> from the reclaimed areas. Embankment appeared stable. Additionally, portions of the <br /> east bank of the Animas River channel had been reinforced with riprap. <br />
The URL can be used to link to this page
Your browser does not support the video tag.