Laserfiche WebLink
July 9, 2012 C-2009-087/Peabody Sage Creek Mine JDM <br /> <br /> <br />TOPSOIL Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />Topsoil salvaging and storage was active in areas of drainage modification during the inspection. Topsoil has <br />been salvaged from the area of the portal, the south coal handling facilities area, south facilities area, the slope east <br />of the portal area and various locations of ditches and roads. The topsoil pile has been seeded and graded to slope. <br />The salvaged topsoil is being placed at the toe of the approved topsoil pile. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br />911 <br />Page of <br /> <br /> <br />