Laserfiche WebLink
July 10, 2012 <br />Horse Gulch Fill Quarterly Inspection Report <br />Second Quarter 2012 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 3 <br />2.1 <br />Removal of All Organic Material and Topsoil 3 <br />2.2 <br />Placement of Underdrainage Systems 3 <br />2.3 <br />Installation of Surface Drainage Systems 3 <br />2.4 <br />Placement and Compaction of Fill Materials 4 <br />2.5 <br />Revegetation 5 <br />3.0 References <br />I certify that this report was prepared by me. <br />5 <br />1 <br />MARIE <br />_ PROFESSIONAL SEAL <br />Tonia Marie Perkins <br />CO PE 43864 <br />= y: 3864 Co* <br />%pn ; �� /Z <br />; <br />Trapper <br />'s'�� <br />Mining, <br />°'�;�,��NAL ��+G����`\ <br />X111,1111111110 v <br />5 <br />1 <br />