My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-12_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2012-07-12_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:22 PM
Creation date
7/12/2012 2:29:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
7/12/2012
Doc Name
1st Quarater 2012 Wastebank Inspection Report
From
New Elk Coal Company
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Development Waste Disposal Area <br />Inspection Period: First Quarter 2012 <br />Inspection Date: 3/31/2012 <br />The Development Waste Disposal Area is located south of State Highway 12 and west of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area has been used for disposal of waste rock from the underground <br />mine. Since mine closure in 1989, the area has been used for disposal of sediment removed <br />from ponds and ditches located within the mine permit area. <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />General Description or Reference to Site Plan: <br />Activity During Inspection: <br />New Elk Mine <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />The DWDA is in final reclamation and no activity has occurred or is scheduled for the area. <br />Typical late spring conditions prevail as minimal precipitation has received this winter resulting <br />in relatively dry soil conditions and reduced vegetation. No problems were observed during <br />this inspection. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and /or <br />discharge, integrity of 100 -year 24 -hour drainage structures, and evidence of positive drainage). <br />Positive drainage is maintained on the surface of the DWP. No evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Fill construction has been completed. Reclamation of the surface has been completed. <br />Page 1 of 2 <br />I uyc L JI L <br />
The URL can be used to link to this page
Your browser does not support the video tag.