My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-06-28_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:03 PM
Creation date
7/12/2012 11:22:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/28/2012
Doc Name
Second Adequacy Review
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
TR65
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 5 <br />footprint. The cost estimate calculated by the Division totals $70,551.08 (see attached cost <br />estimate) compared to NECC's cost estimate of $104,253.16. The Division's estimate is <br />consistent with previous cost estimates approved by both the Division and NECC. If NECC <br />wishes to use the cost estimate calculated by the Division, please submit a revised estimate that <br />matches the estimate calculated by the Division. <br />NECC: Four culverts have been added as part of this adequacy response. Exhibit 28 will be <br />updated after DRMS generates a revised estimate including the four culverts. <br />Division: The Division has calculated a bond estimate required to regrade and seed the West <br />DWDA footprint and the addition of culverts. The cost estimate calculated by the Division totals <br />$71,394.73 (see attached cost estimate) compared to NECC's cost estimate of $104,253.16. The <br />Division's estimate is consistent with previous cost estimates approved by both the Division and <br />NECC. If NECC wishes to use the cost estimate calculated by the Division, please submit a <br />revised estimate that matches the estimate calculated by the Division. <br />NECC Additional Items Revised: <br />1. The Soil Storage Stockpile and Topsoil Stockpile locations have been swapped due to the <br />potential conflict with the overhead power line. In order to accommodate the Soil <br />Storage Stockpile footprint, Ditch 46 -3% has been rerouted to flow into D53, and then <br />into Containment Area No. 2. Please see revised Map 14. <br />Division: Response is sufficient. <br />2. Two culverts have been added to D41 to provide access to the DWDA during <br />construction. These culverts will be temporary and will be removed upon completion of <br />the DWDA pile. <br />Division: Response is sufficient. <br />3. Page 2.05 -47 was revised in order to clarify reclamation specifics for DWDA 43. <br />Division: Response is sufficient. <br />If you have any questions, feel free to contact me. <br />Sincerely, <br />Zach Trujillo <br />Environmental Protection Specialist <br />cc: Jim Stover, J. E. Stover & Associates, Inc. <br />Susan Patton, Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.