My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-08_PERMIT FILE - C1980006
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980006
>
2012-06-08_PERMIT FILE - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:39 PM
Creation date
7/12/2012 10:27:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
6/8/2012
Doc Name
pg 780-66aa to 780-89
Section_Exhibit Name
Part 780 Reclamation and Operations Plan Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 780.18(b) Continued. <br />Grading and recontouring of mined-out areas will result in effective <br />drainage, and a stable configuration blending with surrounding <br />reclaimed and undisturbed areas. The resultant landscape will be <br />similar to premine and adjacent slopes, The postmining landscape <br />will be characterized by relatively short slopes and a relatively <br />flat terrain broken up by undulations created during the restoration <br />of existing draws and ridges. Terraces are not proposed as a method <br />of landscape stabilization. As discussed on pages 780-80 to 780-82, <br />slope lengths will be controlled by the construction of small contour <br />furrows. Figure 19, Typical Design of Contour Furrow, contains a <br />cross-section of this proposed stabilization technique. A discussion <br />of the beneficial effects of contour furrowing for erosion control <br />and the hydrologic balance is found on pages 780-80 to 780-82. <br />Smooth compacted surfaces with long slopes will be avoided by grading <br />_ along the contour and by leaving the surface in a rough state so that <br />erosion and subsequent sedimentation problems are reduced. When <br />possible, final grading before topsoil placement will be done along <br />contour by dozers and motorgraders unless site specific slope <br />conditions would cause a safety hazard to the operator. In the event <br />that final grading occurs more than two weeks prior to soil <br />replacement, Kerr will rip the final graded surface prior to <br />placement of soil. <br />Postmining topography and slopes will approximately match the <br />premining topography and slopes. (See: Map 34a, Kerr Mine Area <br />Premining Topography; Map 36, Kerr Mine Area Postmining Topography; <br />and Map 38, Premining and Postmining Cross Sections (Kerr Mine <br />Area).) Further information regarding backfilling and grading can be <br />found in Section 780.11 and Sections 816.100-106. <br />Backfilling and Grading - Kerr Tipple Area <br />Following the cessat.ion_.of. operations~_.faci]ity__rQmovaL and.cleanup_ -.. ... <br />at the tipple, all disturbed lands will be graded to their <br />approximate original contour. Because the area has little <br />topographic <br />780-69 as Revised -January, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.