My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-11_PERMIT FILE - P2012009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012009
>
2012-07-11_PERMIT FILE - P2012009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:14 PM
Creation date
7/11/2012 3:24:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012009
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2012
Doc Name
REVISED NOI APPLICATION
From
AL DOWDY
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />1/2 inch if that much, this land has little to no top soil. Whatever is found will be stockpiled <br />beside the trench for backfilling. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, edits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />
The URL can be used to link to this page
Your browser does not support the video tag.