Laserfiche WebLink
Response to DRMS Adequacy Review #2 — Cotter JD -8 Mine Reclamation Plan Amendment <br />Exploration drill hole 79 -303, located 102 feet north of the proposed monitoring well <br />location, was drilled to 680 feet and logged as dry. <br />8) Figure 4, Location of cross - sectionals for water levels and drill holes, shows three cross - <br />sectionals across future mining areas. Please provide a cross - sectional D -D' in the <br />general area of holes 77 -108 to 84 -8 across the area to be developed first beyond current <br />workings. <br />Cotter response: A cross section in the general vicinity of holes 77 -108 to 84 -8 is <br />provided in Attachment 4. This cross - section was originally prepared by Cotter <br />geologists in 1988 using information obtained from the surface exploration efforts <br />conducted previously by Cotter in this area. The cross section is referred to by its <br />original identification, El -E1', and extends from drill hole 84 -14 to drill hole 84 -1. <br />Tim Cazier, Division Engineer: Review and Comments on Cotter Response to Adequacy Review, <br />Attachment 4 /Attachment A Drainage Design Plan prepared by Whetstone Associates (dated <br />March 25, 2012) <br />General Comments: <br />1. It appears the labels on Figures 1 and 2 are reversed. Beginning on page 1, references <br />are made to six drainage areas shown on Figure 2, labeled 1 through 6, as indicated in <br />Table 1. These six drainage areas appear to be on Figure 1, not Figure 2. Page 2 <br />appears to correctly reference Figure 2 for drainage areas N -A through N -F. However, <br />the figure references appear to be reversed in the remainder of the drainage plan. For <br />example, on page 9 it refers to Retention Pond 2 (Zone 6 in Figure 2). These are both on <br />Figure 1. Please correct the figure numbers and/or the references in the text to correctly <br />refer to the appropriate figures. <br />Cotter response: The figure numbers and references have been corrected in the <br />revised Drainage Design Plan, which is provided in Attachment 5. <br />2. Three separate terms are used interchangeably to "label" the 12 different areas from <br />which runoff is contributed: zone, area/drainage area, and catchment. Please use <br />consistent nomenclature in the text and figure labels. Typical nomenclature is either sub - <br />basin or sub - catchment. <br />Cotter response: The terms "catchment" and "drainage area" have been replaced <br />with the term "sub- basin" throughout the revised Drainage Design Plan. <br />3. Figure 3: Page 13 refers to Areas 1 and 4 on Figure 3. Neither Area 1 nor Area 4 <br />appears to be delineated or labeled on Figure 3. Please delineate and label in a manner <br />consistent with the text. <br />Cotter response: Areas have been delineated and labeled as requested in the revised <br />Drainage Design Plan, which is provided in Attachment 5. <br />Page 5 <br />