Laserfiche WebLink
Parameter <br />Spillway <br />Pond 1 <br />Spillway <br />Pond 2 <br />Optional <br />Culvert <br />Pond 2 <br />Design Flow (cfs) <br />1.5 <br />3.7 <br />3.7 <br />Bottom Width (ft) <br />2.0 <br />5.0 <br />Spillway Depth or Culvert Diameter (ft) <br />1.0 <br />1.0 <br />1.5 <br />Headwater Depth (ft) <br />0.4 <br />0.5 <br />1.1 <br />Flow depth (ft) <br />0.2* <br />0.25* <br />0.6 <br />Velocity (ft/s) <br />2.3* <br />2.6* <br />5.2 (exit) <br />Slope (ft/ft) <br />0.06* <br />0.05* <br />0.03 <br />Length (ft) <br />10 <br />10 <br />30 (est.) <br />Invert Entry (relative to 10 -year storage elev) (ft) <br />0.0 <br />0.0 <br />-1.5 ** <br />JD -8 Mine — Drainage Design Plan 11 <br />Excess flows from Retention Pond 2 will be conveyed across a roadway spillway or through a spillway and <br />roadway culvert (see Figure 1) per the operating requirements of the mine. The culvert invert has been <br />selected to avoid interference between culvert headwater and correct spillway operation. A culvert design <br />profile is provided in Attachment lb. <br />Spillway crest elevations will be identical to the 10 -year 24 -hour storage elevation for all retention ponds. <br />The spillways will be constructed to the design specifications in Table 10 and will generally follow the <br />schematic provided in Attachment 3. <br />Table 10. Mine Site Planned Drainage Structure Parameters <br />*Down gradient from spillway crest <br />* * Culvert approach channel to be 1.75 ft deep <br />In consideration of the exit flow conditions, a gravel mulch lining with a D50 of 2" (see Section 2) has been <br />selected for both spillways and exit chutes based on Table 2.3 of HEC -15 (FWHA 2005). <br />4. OPERATIONAL AND POST - MINING DRAINAGE CONDITIONS <br />When mining resumes, the existing waste rock pile will be built up to house additional mine facilities <br />including a new maintenance shop and office. During the build -out period, drainage will be modified to <br />prevent water from accumulating in the facilities area and to prevent excessive erosion and sedimentation <br />during operations. For the post- mining reclamation period, drainage will be engineered and constructed to <br />reduce erosion and protect reclaimed surfaces. <br />4.1 Runoff Areas and Routing <br />Flow directions and runoff areas during mine operations will resemble the current condition and are shown <br />in Figure 3 and Table 11. However, the waste rock pile will be expanded to encompass the area currently <br />occupied by the existing constructed catchment (Pond 2) and planned expansion/construction of the <br />western catchment (Pond 3) near the topsoil stockpile. When these storm water retention facilities are <br />removed and replaced by waste rock, the pre- existing road will be realigned between the property boundary <br />and the toe of the waste rock pile. Water will be routed westward across the site and southward off the face <br />of the waste rock pile. Two interceptor ditches will be constructed to convey water to the proposed new <br />storm water Retention Pond 3 located west of the planned final waste rock pile. The upper interceptor ditch <br />(Figure 3) will divert upland runoff from Sub -Basin N -E to the natural drainage west of the waste rock pile <br />and Pond 3, thus preventing non - contact flows from entering the retention structure. This upper interceptor <br />ditch will be constructed on the upslope (south) side of an existing drill road. The lower interceptor ditch <br />will route water from the waste rock pile and eastern sub -basin along the toe of the pile to Pond 3 and will <br />be constructed on the upslope (south) side of the realigned road along the property boundary and toe of the <br />waste rock pile. <br />4122A.120702 Whetstone Associates • <br />