Laserfiche WebLink
Response to DRMS Adequacy Review #2 — Cotter JD -8 Mine Reclamation Plan Amendment <br />TABLE OF CONTENTS <br />Response to DRMS Comments 3 <br />Attachments A- 1 <br />Attachment 1 — Figure C -6 Mine Plan Map with Vent Hole and Cultural Resource Area <br />Attachment 2 — Revised Figure E -2 - Gamma Survey <br />Attachment 3 — Map Showing Proposed Monitoring Well Location <br />Attachment 4 — Cross Section El -El' <br />Attachment 5 — Revised Drainage Design Plan for the JD -8 Mine EPP (Attachment A to <br />Stormwater Management Plan) <br />Page 2 <br />