My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-11_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2012-07-11_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:15 PM
Creation date
7/11/2012 10:41:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/11/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
DRMS
To
Kathy Welt
Type & Sequence
TR129
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Drill Pads <br />Permit Action: <br />Technical Revision <br />129 Permit /Job #: C1980007 <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 29B <br />Date: 7/11/2012 <br />User: JRS <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Rippe: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />NA <br />feet /second <br />Area: <br />Utilization % <br />Ownership Cost/Hour: <br />$65.28 <br />Average Ripping Width: <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />125.00 <br />100 <br />Ripper Operating Cost/Hour: <br />$6.49 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />Production per unit area: <br />NA <br />Total Unit Cost/Hour: <br />$213.07 <br />Total Fleet Cost/Hour: <br />$213.07 <br />0.730 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods <br /> seismic: <br />Area: <br />NA Bank Volume: NA BCY NA <br />11.00 acres Rip Depth (ft): <br />Source of estimated quantity: <br />HOURLY PRODUCTION <br />2.00 <br />Estimate <br />Volume: 35,493 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet /second <br />Area: <br />Average Ripping Depth: <br />2.56 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />125.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.730 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.730 <br />Acres/hr <br />Site Altitude: <br />8,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.61 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.61 <br />Acres/hr <br />DRMS <br />Abbreviation: None <br />Filename: C007 -29B <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.