Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Well pads covered under this NOI are listed in attached Table 1 and shown on the attached well pad location <br />maps. Pads vary from single to multi -well drill pads with up to 2 containment/infiltration pits installed per pad to <br />well pad layout are provided on attached Figures 1 through 4. Please refer to attached Page 10, Heading 111 <br />Project Description for additional information regarding this MRP Well Pad Ground Water Discharge NOI. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 39 Average Width 207 (ft) Average Length 142 (ft) <br />B. Drill Holes: Quantity 265 Depth variable (ft) Diameter variable (in) <br />C. Mud Pits: Quantity 39 - 78 Average Width 87 (ft) Average Length 44 (ft) <br />Average Depth 12 - 14 (ft <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Underground work previously authorized in existing DRMS Prospecting NOIs consists of drilling new <br />holes on existing drill pads and periodic hydrologic testing and monitoring of active wells. The <br />dimensions of each f,urehvle to be covered under th Ground W ater Discharge NOI are provided in <br />the original Shell Frontier Oil & Gas Inc. (SFOGI) DRMS Prospecting NOIs and subsequent <br />modifications, on file at DRMS. These NOIs are as follows: P- 2005 -002, P- 2005 -017 (pads 99 to 103 <br />only), P- 2006 -013, P- 2006 -035 (pad only), and P- 2007 -010. The quantity of mud p i t s is shown as a <br />range since some pads require only 1 mud pit whereas other pads may require 2 pits. <br />F. Other Disturbances (please describe): <br />None <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />See attached Table 2 <br />F. New Road(s): Length 0.00 (ft) Width 0.00 (ft) <br />Significantly Upgraded Road(s) Length 0.00 (ft) Width 0.00 (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new roads or improvements to existing reads are heing proposed in this NOl This NOI <br />is limited to authorizing ground water discharges associated with drilling activities previously <br />authorized under existing DRMS NOIs. See attached Table 1 for a complete list. <br />