Laserfiche WebLink
this undisturbed area (see;photo 7498). This did not offset SCC's need to establish aspen in shrub plots, <br />although it will provide a Major source stock for aspen reestablishment on reclaimed lands. <br />Diversion channels reporting to Pond 17 require maintenance. Rip rap has slid down the channels, <br />creating rock aprons at th. base of each (see photo 7499). <br />Field evaluation of this site indicates wildlife post mining land use reclamation is successful under <br />DRMS's program. Inspectii►ns of two other reclaimed mine sites with wildlife post mining land uses are <br />being conducted this eval ation year (July 1, 2011 —June 30, 2012). The combined results will be <br />reported in OSM's EY 201 Annual Evaluation Report for Colorado. <br />No compliance issues wer noted and no enforcement actions were taken as a result of this inspection. <br />