My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2012-07-05_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:44 PM
Creation date
7/9/2012 10:21:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
7/5/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Ron Thompson - New Elk Coal Company, LLC
Type & Sequence
RN3
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Return Route: <br />Haul Time: 0.402 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />964.29 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 804.13 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />(min) <br />1 <br />1200.00 <br />8.00 <br />5.00 <br />13.00 <br />1362 <br />0.925 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.642 /LCY <br />Page 6 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />402.07 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4.84 Hours <br />Total job cost: $6,353.54 <br />CIRCES Cost Estimating Software <br />Return Time: 0.925 <br />Total Truck Cycle Time: 4.877 <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />484.42 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 804.13 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.642 /LCY <br />Page 6 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />402.07 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4.84 Hours <br />Total job cost: $6,353.54 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.