Laserfiche WebLink
Return Route: <br />Haul Time: 2.516 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />964.29 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 852.43 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />(min) <br />1 <br />2400.00 <br />-4.00 <br />5.00 <br />1.00 <br />3569 <br />0.835 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $2.067 /LCY Total job cost: <br />Page 64 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />284.14 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />0.75 Hours <br />$1,116.27 <br />CIRCES Cost Estimating Software <br />Return Time: 0.835 <br />Total Truck Cycle Time: 6.901 <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />342.34 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 852.43 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $2.067 /LCY Total job cost: <br />Page 64 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />284.14 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />0.75 Hours <br />$1,116.27 <br />CIRCES Cost Estimating Software <br />