Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.600 <br />(FND -SF) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3756 <br />Adjusted unit production: 396.48 LCY/hr <br />Adjusted fleet production: 792.96 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.654/LCY <br />Total job time <br />Total job cost <br />4.32 Hours <br />$2,240.43 <br />Page 42 of 107 <br />CIRCES Cost Estimating Software <br />