Laserfiche WebLink
Page 33 of 107 <br />1 1500.00 3.00 5.00 8.00 1023 1.523 <br />Haul Time: 1.523 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />1 <br />1500.00 <br />-3.00 <br />5.00 <br />2.00 <br />3569 <br />0.604 <br />Loading Tool unit <br />Production 964.29 <br />Truck Unit Production <br />416.15 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.604 <br />Total Truck Cycle Time: 5.677 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 690.81 <br />Adjusted single truck/loader team production: 690.81 <br />Adjusted multiple truck/loader team production: 690.81 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.891 /LCY <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 2.98 Hours <br />Total job cost: $3,892.47 <br />minutes <br />minutes <br />800.36 LCY/Hour <br />345.41 LCY/Hour <br />CIRCES Cost Estimating Software <br />