Laserfiche WebLink
Return Route: <br />Haul Time: 0.343 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />964.29 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 839.60 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />(min) <br />1 <br />1000.00 <br />8.00 <br />5.00 <br />13.00 <br />1362 <br />0.778 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.723 /LCY <br />Page 21 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />419.80 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 8.27 Hours <br />Total job cost: $10,835.48 <br />CIRCES Cost Estimating Software <br />Return Time: 0.778 <br />Total Truck Cycle Time: 4.671 <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />505.78 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 839.60 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.723 /LCY <br />Page 21 of 107 <br />minutes <br />minutes <br />minutes <br />800.36 LCY/Hour <br />419.80 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 8.27 Hours <br />Total job cost: $10,835.48 <br />CIRCES Cost Estimating Software <br />