Laserfiche WebLink
Page 15 of 107 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />T m �) <br />(min) <br />1 <br />600.00 <br />17.00 <br />5.00 <br />22.00 <br />359 <br />1.676 <br />Haul Time: 1.676 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />(min) <br />1 <br />600.00 <br />-17.00 <br />5.00 <br />-12.00 <br />1920 <br />0.406 <br />Return Time: 0.406 <br />Total Trick Cycle Time: 5.632 <br />Loading Tool unit <br />Production 964.29 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />419.48 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly trick team production: 696.33 <br />Adjusted single truck/loader team production: 696.33 <br />Adjusted multiple truck/loader team production: 696.33 <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />1 Team(s) <br />$1.887 /LCY <br />Total job time: <br />Total job cost: <br />minutes <br />minutes <br />800.36 LCY/Hour <br />348.17 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />8.17 Hours <br />S10.741.74 <br />CIRCES Cost Estimating Software <br />