My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2012-07-05_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:44 PM
Creation date
7/9/2012 10:21:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
7/5/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Ron Thompson - New Elk Coal Company, LLC
Type & Sequence
RN3
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 107 <br />Truck Bed (volume) Basis <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />46.50 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 39.38 LCY <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 11.250 LCY (Heaped) <br />Bucket Fill Factor: 0.875 Loose material - 1" and over (85 - <br />Adjusted Capacity: 9.844 LCY <br />0.875 <br />Job Condition Corrections: Site Altitude (ft): 7100 feet <br />Net Correction: Lā <br />Loadine Tool Cycle Time: <br />Excavators and Front Shovels: <br />0.830 L 0.830 <br />Number of Loading Tool Passes Required to Fill Truck: 4 <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders ā Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.600 minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: Lā <br />Loadine Tool Cycle Time: <br />Excavators and Front Shovels: <br />0.830 L 0.830 <br />Number of Loading Tool Passes Required to Fill Truck: 4 <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders ā Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.600 minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: -0.050 <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />passes <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: -0.050 <br />minutes <br />Adjusted Loader Cycle Time: 0.550 <br />minutes <br />Net Load Time per Truck: 1.750 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Tune: 0.70 <br />Minutes Adjusted for site altitude: <br />0.700 Minutes <br />Truck Load Time: 1.750 <br />Minutes Adjusted for site altitude: <br />1.750 Minutes <br />Truck Maneuver and Dump Time: 1.10 <br />Minutes Adjusted for site altitude: <br />1.100 Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />passes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.