Laserfiche WebLink
Return Route: <br />Page 9 of 107 <br />Haul Time: 1.345 minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />700.00 <br />-11.00 <br />5.00 <br />-6.00 <br />3512 <br />0.254 <br />Loading Tool unit <br />Production 964.29 <br />Truck Unit Production <br />Optimal No. of Trucks: 2 <br />Return Time: 0.254 <br />Total Truck Cycle Time: 5.149 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 761.65 <br />Adjusted single truck/loader team production: 761.65 <br />Adjusted multiple truck/loader team production: 761.65 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $1.725 /LCY Total job cost: <br />minutes <br />minutes <br />800.36 LCY/Hour <br />380.83 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />7.31 Hours <br />$9,607.04 <br />CIRCES Cost Estimating Software <br />