My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-06_HYDROLOGY - C1981019
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981019
>
2012-07-06_HYDROLOGY - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:57 PM
Creation date
7/6/2012 1:44:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
HYDROLOGY
Doc Date
7/6/2012
Doc Name
2nd Quarter 2012 DMRS (CO-00045161)
From
Colowyo Coal Company
To
WQCD
Permit Index Doc Type
DMR’s
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COAL <br />COMPANY <br />steady. Water from the spring that flows into East Taylor Pond was sarnpled on June 21, 2012 <br />and laboratory analysis was received on June 26, 2012. The sample was taken at a location just <br />upstream from its inflow into the pond. The laboratory analysis for the spring indicated the <br />level for Total Suspended Solids were 6 mg /L, compared to 46 mg /L for the Outf all analysis <br />taken the same day. East Taylor Pond was dredged during August of 2011, and 2088 yards of <br />material was removed from East Taylor Pond. Please see attached climatological data, sample <br />analysis reports, and pictures taken of East Taylor Pond during the month of June. <br />Colowyo's historical laboratory analysis data does not show a trend toward any type of elevated <br />levels at this outfall. The elevated levels Colowyo does experience are associated with either a <br />precipitation or runoff event. Colowyo does not believe that the elevated levels are related in <br />any way to a lack of proper pond function as routine inspections of the pond show that it is <br />functioning as designed. Colowyo will continue to closely monitor this and all other outfalls for <br />indications of proper impoundment function. <br />If you should have any additional questions or concerns please feel free to contact me at you <br />convenience at (970) 824 -1573. <br />Sincerely, <br />,„„,,,, A <br />Chip Brown <br />Environmental Engineer <br />CC: CDRMS /Rob Zuber <br />NPDES Reports Binder w /encl. <br />C.F. 21.1.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.