My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-06_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2012-07-06_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:01 PM
Creation date
7/6/2012 12:22:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/6/2012
Doc Name
1st & 2nd Landslide Repair Review (Email)
From
Jonathan White
To
DRMS
Type & Sequence
TR128
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />COLORADO GEOLOGICAL SURVEY— serving the people of Colorado C OLORADO <br />Department of Natural Resources <br />1313 Sherman Street, Room 715 P FF 7 <br />Denver, CO 80203 <br />Phone: (303) 866 -2611 <br />Fax: (303) 866 -2461 Ii t <br />t)EPA1UMENT OF <br />NATURAL <br />RESOURCES <br />DATE: June 14, 2012 <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />TO: Jim Stark, Dan Hernandez, David Berry (DRMS) Vincent Matthews <br />Division Director and <br />FROM: Jon White (CGS) State Geologist <br />SUBJECT: CGS review of Haul Road (HR -1) landslide repair to the West Elk Mine RPEE (TR <br />128) and the ST -02 (coal stockpile pad) landslide repair. <br />At the request of the Colorado Division of Reclamation, Mining and Safety (DRMS), the <br />Colorado Geological Survey (CGS) is providing this review of two landslide repairs at the West Elk <br />Coal Mine. The first is the ST -02 coal stockpile pad landslide repair and the second is the RPEE <br />Haul Road 1 (HR -1) landslide repair. A site inspection was conducted with Jim Stark and Zach <br />Trujillo on April 10, 2012. At the time of the inspection the landslide repair at ST -02 was complete <br />and the repair at the haul road essentially complete except for some drainage issues and final <br />grading. <br />In addition to the site inspection, the CGS examined the following documents for this review: <br />1) Subsurface Exploration Program, Geotechnical Recommendations, Slope Evaluation and <br />Remediation report prepared by Ground Engineering Consultants, Inc. prepared October 6, 2011 <br />(Job No. 11 -6014) prepared for the ST -02 landslide, and 2) TR -128 Haul Road Slide Repair <br />Documentation, Slope Stability Monitoring Instrumentation, and Drainage Revisions prepared May <br />2012 by Barr Engineering Co. Please consider the following observations as you review the technical <br />revision that has been submitted. <br />Observations and Recommendations <br />The following review and observations are based on the site review conducted on April 10, <br />2012 and the review of the reports referenced above. For ease of review we have separated <br />comments for the two slide locations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.