My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-06_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-07-06_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:03 PM
Creation date
7/6/2012 11:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
7/6/2012
Doc Name
Adequacy Questions #1 Letter
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
TR74
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />July 6, 2012 <br />Jim Stover <br />J. E. Stover & Associates <br />2352 North 7 St., Unit B <br />Grand Junction, CO 81501 <br />Re: Bowie No. 2 Mine Permit No. C- 1996 -083 <br />Technical Revision No. 74 (TR -74), Air Jig Plant <br />Adequacy Questions #1 <br />Dear Mr. Stover: <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division of Reclamation Mining and Safety (Division) received Bowie Resources, LLC's (BRL) <br />application for TR -74 on June 22, 2012 and it was deemed complete on June 27, 2012. The Division <br />has the following adequacy review comments regarding the proposed plan. <br />Cost estimate <br />1. The thickness of the concrete floor for the air jig building was not included in the building <br />description. What is the proposed concrete floor thickness? <br />2. On Map 15 -1, the refuse conveyor is shown going from between the air jig plant and the <br />preparation plant buildings to a point on the existing refuse conveyor. Are transfer stations <br />proposed at these points on the conveyor belts? Are supports and footers proposed for the <br />conveyor belts? <br />3. The size of the air jig building is listed as 65 feet X 40 feet on page 2.05 -19 for a total of <br />2,600 ft The cost estimate included with the application package lists the building as 2,456 <br />ft Please clarify the building's square footage. <br />If you have any questions, please contact me. <br />Sincerely, <br />�� <br />Brock F. Bowles <br />Environmental Protection Specialist <br />cc: William Bear, Bowie Resources, LLC <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.