My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-06_HYDROLOGY - C1981010
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981010
>
2012-07-06_HYDROLOGY - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:57 PM
Creation date
7/6/2012 11:05:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
HYDROLOGY
Doc Date
7/6/2012
Doc Name
2nd Quarter 2012 Sediment Pond Inspection
From
Trapper Mining Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POND IDENTIFICATION <br />Sage #1 <br />Sage #2 <br />Approximate water level <br />17 f y <br />D ry <br />Sediment level (% total storage) <br />/11 IMO.- <br />/y1 ;yI /)i & L <br />Outflow (cfs)• <br />Q <br />O <br />Sediment marker (install or replace) <br />1 y' pLGLL p <br />i in p C- <br />e_ <br />Identification sign (install or replace) <br />1 n pLad tr, <br />1 h p La. C E. <br />EROSIONAL: <br />Rills and /or gullies on downstream face <br />!v a <br />0 <br />Rills and /or gullies on upstream face. <br />/j 0 <br />` <br />r 0 <br />Inadequate vegetation <br />ij 0 <br />N 0 <br />Outlet channel erosion. <br />d 3 <br />0 <br />Burrows. <br />O <br />Erosion of toe. <br />/J Q <br />P 0 <br />Water impounded against downstream toe. <br />� 0 <br />PO <br />Other. <br />-- <br />—" <br />_ <br />STRUCTURAL: <br />Differential settling <br />0 <br />J <br />/V 0 <br />Cracks, slides, or scarps <br />N0 <br />J - U � <br />Seepage (specify location, color, value) <br />n/ 3 <br />' 0 <br />N 0 <br />Defective spillways <br />t, <br />1'I D <br />Other <br />— <br />— <br />_ <br />APPURTENANT STRUCTURES: <br />Defective spillways <br />/1 <br />/1/Q Q <br />Dewatering device clogged <br />))) CI <br />,AJ U <br />Cracking or crushing of pipes. <br />/�� �) <br />1- <br />/l�//9 <br />Other <br />/ <br />-�- <br />COMMENTS ( ,� <br />/ <br />o 1 . <br />o k / i 1 s /1 <br />MAINTENANCE REQUIRED ) I ' 1 <br />MC <br />n <br />I nun' Elm Tyr.' <br />FILE 118 7 <br />INSPECTOR: I t)Ck_ IV CKeLS <br />DRAINAGE: SAGE GULCH <br />TRAPPER MINING INC. <br />QUARTERLY SEDIMENT POND INSPECTION REPORT <br />a c20/GX <br />SIGNATURE: ‘L.r/ /✓ r "/4‘,612441 <br />DATE OF INSPECTION: {p // A / / <br />
The URL can be used to link to this page
Your browser does not support the video tag.