My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-07-05_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:44 PM
Creation date
7/5/2012 2:13:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
7/5/2012
Doc Name
Adequacy Questions # 1
From
DRMS
To
J. E. Stover & Associates
Type & Sequence
MR131
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />July 5, 2012 <br />Tamme Bishop <br />J. E. Stover & Associates <br />2352 North 7' St., Unit B <br />Grand Junction, CO 81501 <br />Re: Bowie No. 2 Mine Permit No. C- 1996 -083 <br />Minor Revision No. 131 (MR -131), Revised Ditch D -D3 Design <br />Adequacy Questions #1 <br />Dear Ms. Bishop: <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division of Reclamation Mining and Safety (Division) received Bowie Resources' application <br />for the referenced revision on June 25, 2012. The revision was deemed complete on June 26, 2012 <br />and revised decision date is July 19, 2012. The Division's comments to BRL's MR -131 application <br />are below. <br />1. The newly revised page EXH. 8 -291 does not coincide with the currently approved page. The <br />currently approved pages EXH. 8 -29 and 8 -291 have ditches C10 and CI I at the bottom of <br />page 8 -29, and CI I and C12 at the top of page 8 -291. The new page 8 -291 starts off with <br />C13, so C12 is omitted. Please revise page 8 -291 to include C12. <br />2. The rip rap sizing calculations on pages EXH. 8 -252 and EXH. 8 -253, resulting in a required <br />D50 of 0.83' for Ditch D3 -1 and D3 -2 and 1.17' for Ditch D -3 -3 appear to be in error. Using <br />the same equation, DRMS calculations show a required D50 of 1.64 for Ditch D3 -1 and D3 -2 <br />and 2.55' for Ditch D3 -3. Please review the calculation to verify and correct the calculations <br />and revise the pages accordingly. <br />If you have any questions, please contact me. <br />Sincerely, <br />Brock F. Bowles <br />Environmental Protection Specialist <br />cc: William Bear, Bowie Resources, LLC <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.