April 1997 Monthly Report <br /> Page 2 <br /> - Surface Mill Tailings at Eureka <br /> No work was done on this project in April due to snow-cover. <br /> The determination on whether additional work is required will <br /> be made after snow clears and an inspection can be made in the <br /> spring. <br /> - Gold Prince - Mill Tailings <br /> No work was done on this project in April due to snow-cover <br /> and loss of access for the winter. <br /> Implementation of the amended work plan is planned for the <br /> 1997 construction season and will begin with completion of the <br /> portal bulkhead. The interior bulkhead was completed in 1996. <br /> - Ransom Tunnel <br /> Implementation of the work plan for this project was started <br /> in April. The portal was opened, caved portal timber sets <br /> replaced and standing timber sets reinforced. By month end, <br /> ventilation was being placed and drift rehabilitated for <br /> access and inspection to select potential bulkhead sites. <br /> Planned work for May includes bulkhead site selection, <br /> bulkhead design, coffer dam construction, pipe placement and <br /> form construction. <br /> Longfellow - Koehler Mine Waste Project <br /> During the month of April, no on-site remediation work was <br /> done due to snow-cover and completion of the projects that <br /> access was maintained to in March. No samples were taken in <br /> March although the site was inspected periodically for <br /> indications that site flows might be increasing. There were <br /> no changes noted in April . <br /> Grading of Koehler dump material and pond sediment placed on <br /> the Mayflower Mill - Tailings Pond 14 during the winter was <br /> started in April. Through the winter 374.6 tons of alkaline <br /> material had been purchased for mixing with the dump and pond <br /> sediment material. This would make a ratio of 85:1. Bench <br /> testing showed a requirement of 142 : 1. This material was <br /> mixed with the waste material during stockpiling and during <br /> grading. <br /> Planned activity for May includes monitoring the site for <br /> spring flows and sampling the site. <br />