Laserfiche WebLink
SUNNYSIDE GOLD CORPORATION <br /> Project Period A-72 Monitoring Results and Evaluation <br /> cfs <br /> 100 cfs< Q<300 cfs Q>300 cfs <br /> N(l) DATE 0 dZn �—N(Q <br /> cfs 1 cfs u /L cts /I <br /> 519 —366- <br /> 124 144 104 <br /> 18-Jun-96 515 280 ---0.25 <br /> 16-Jul-9-6 . -----120 325 -0.51 <br /> -101 440 028 <br /> 27-Sep-96 129 357 -0.29 <br /> 1�4 -------4-32 18-Oct-96 0.23 <br /> 92 535 0.13 <br /> 97 1.50 <br /> 4— <br /> 08-J an- f 695 2 <br /> CF5-Feb- <br />