Laserfiche WebLink
999 <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> ppr� <br /> 1 31 3 Sherman St., Room 215 <br /> Denver, Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX (303)832-8106 <br /> « vjj� DEPARTMENT OF <br /> x NATURAL <br /> eptember 17, 1996 �` RESOURCES <br /> Mr. LarryPerino Roy Romer <br /> Governor <br /> eclamation Manager <br /> James 5 Lochhead <br /> Sunnyside Gold Corporation Executive Director <br /> P.O. BOX 177 Michael B Long <br /> Division Director <br /> Silverton, CO 81433 <br /> RE: Gold Prince Bulkhead Location Preparation Inspec Ii On, Consent Decree Mine <br /> Remediation Project. <br /> Dear Mr. Perino: <br /> Please find attached, copy of DMG 9/16/96 memo from Allen Sorenson. Please respond <br /> to the assumptions identified by Mr. Sorenson, specifically dealing with bulkhead location <br /> preparation methods and utilization of a previously approved concrete mix that will result <br /> in a 28 day concrete strength of 3000 psi. <br /> As recommended by Mr. Sorenson, DMG Durango staff are requesting that SGC provide <br /> date and time for DMG to inspect bulkhead location preparations prior to the concrete <br /> pour. <br /> Please contact me at the DMG field office in Durango, 484 Turner Drive, Building F, Suite <br /> 101 , Durango, CO 81301 , phone (970) 247-5193, if I can be of greater service. <br /> Sincerely, <br /> Wallace H. Erickson <br /> Environmental Protection Specialist <br /> cc: Allen Sorenson, DMG Denver <br />