My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-04-21_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1997-04-21_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 8:02:33 PM
Creation date
7/3/2012 7:19:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
4/21/1997
Doc Name
EPA- 1st Qtr 1997 Rpt
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t 999 III <br /> i(UrmYSIDE GOLIZ CORPORATION <br /> AN ECHO DAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> �`�cQ3ved <br /> April 16 , 1997 ��R <br /> M - 1g77- 37& <br /> j Attention: Ron Zdyb <br /> Mail Code: 8D2-W-GW L�^ �nCs�-•• <br /> ,.` <br /> U.S. Environmental Protection Agency y <br /> Underground Injection Control (UIC) <br /> 999 18th Street, Suite 500 <br /> Denver, CO �80202-2466 <br /> RE: - EPA File No. C05000-03745, San Juan County, Colorado <br /> - 1s7 Quarter 1997 Report (January - March) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's <br /> June 26, 1996 Rule Authorization letter for injection of water and <br /> alkaline material into the Sunnyside Mine, Sunnyside Gold <br /> Corporation (SGC) submits the following report. This e ort covers <br /> the period from January 1, 1997 through March 31, 996. dd <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead valve was closed upon site <br /> demobilization. Fluid injection was suspended on October 9 , 1996 <br /> due to weather conditions at the site. This site will be <br /> inaccessible until around June 1 , 1997. The mine pool elevation <br /> was still below 11 , 600' elevation on March 31, 1997 therefore, <br /> bulkhead pressure should be at 8 psi . <br /> American Tunnel Bulkhead <br /> The American Tunnel bulkhead was inspected, gage pressure readings <br /> taken and fluid samples analyzed for pH, conductivity and <br /> temperature more frequently than the requirements of Items 3 . and <br /> 4 . in the Rule Authorization letter. This information is attached. <br /> The American Tunnel bulkhead valve has remained closed since <br /> closure on September 9, 1996 . <br /> Site inspections have not revealed any indication that the bulkhead <br /> is performing other than as designed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.