Laserfiche WebLink
File No. C05000-0375 <br /> 4th Quarter 1996 Report <br /> Page 2 <br /> Injection Quantities <br /> Alkaline injection was stopped on October 9, 1996. From project <br /> startup on July 18, 1996 through October 9, 1996, a total of 33.238 <br /> million gallons were injected containing 410.5 tons of hydrated <br /> lime. Additional lime was not injected since the 3rd quarter <br /> report. Additional fluid injected in the 4th quarter was stream <br /> water injected to dissolve any particulate lime behind the bulkhead <br /> and push the alkaline water in the perched pool behind the Terry <br /> Tunnel bulkhead into the main mine pool. <br /> Please contact me if you have any questions on this report. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Kathleen Sullivan, CDPHE <br /> Wally Erickson, DMG <br />