Laserfiche WebLink
10 -Yr 24 -hr Event <br />Graphical Peak Discharge <br />Project: SWB -7 By: B Langenfeld Date: 05/23/12 <br />Location: Revenue Mine Checked: Date: <br />Developed <br />1. Data: <br />Drainage area: .................... A = 14.4310Acres <br />Runoff Curve Number: ............. CN = 87 <br />Time of Concentration: ........... Tc = 0.04 <br />Storm Type :....................... = II <br />Pond and swamp areas spread <br />10 -Yr 24 -hr Event <br />Runoff Curve Number and Runoff <br />Project: SWB -8 By: B Langenfeld Date: 05/23/12 <br />Location: Revenue Mine Checked: Date: <br />Developed <br />1. Runoff Curve Number (CN) <br />Cover description CN Soil Group Area(Acre) <br />Mined Land, Disturbed (Poor) 87 C 1.563 <br />CN (weighted): 87.0 <br />Total Area: 1.563 Acre <br />2. Runoff <br />Return Period: 10 -Year <br />Rainfall, P: 2.20 in <br />Runoff, Q: 1.0645 in <br />Runoff Volume: 0.1386 Acre -Ft <br />Revenue Mine August 2012 6 -6 <br />throughout watershed ............... = <br />0.00 percent of A <br />0.0000 Acres <br />2. <br />Frequency ........................yr <br />= <br />10 <br />3. <br />Rainfall ,P(24 - hour) .............. <br />in = <br />2.20 <br />4. <br />Initial abstraction, Ia............ <br />= <br />0.2989 <br />5. <br />Compute Ia /P ....................... <br />= <br />0.1358 <br />6. <br />Unit peak discharge, qu <br />...... csm /in = <br />991.04 <br />7. <br />Runoff ,Q .........................in <br />= <br />1.0645 <br />8. <br />Pond & swap adjustment <br />factor .... Fp = <br />1.00 <br />9. <br />Peak Discharge,gp ...............cfs <br />= <br />23.7875 <br />10 -Yr 24 -hr Event <br />Runoff Curve Number and Runoff <br />Project: SWB -8 By: B Langenfeld Date: 05/23/12 <br />Location: Revenue Mine Checked: Date: <br />Developed <br />1. Runoff Curve Number (CN) <br />Cover description CN Soil Group Area(Acre) <br />Mined Land, Disturbed (Poor) 87 C 1.563 <br />CN (weighted): 87.0 <br />Total Area: 1.563 Acre <br />2. Runoff <br />Return Period: 10 -Year <br />Rainfall, P: 2.20 in <br />Runoff, Q: 1.0645 in <br />Runoff Volume: 0.1386 Acre -Ft <br />Revenue Mine August 2012 6 -6 <br />