My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-14_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2012-06-14_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:54 PM
Creation date
7/2/2012 3:20:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/14/2012
Doc Name
TR-03 SUBMITTAL
From
WILDCAT MINING
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARDON MINING INDUS I HY CONSULTANTS <br />TEEL LLC 18050 COUNTY ROAD G • CORTEZ. CO 81321 • 970.565.0278 • MT@REARDONSTEEL.US <br />June 13, 2012 <br />Dustin Czapla <br />Division of Reclamation, Mining and Safety <br />101 South 3` Suite 301 <br />Grand Junction, CO 81501 <br />Page 1 of 2 <br />RECEIVED <br />JUN 1 4 2012 <br />GRAND JUNCTION FIELD OFFICE <br />RECLAMATION INING OF <br />& SAFETY <br />RE: Technical Revision 3, May Day Idaho Mine Complex, Permit No. M- 1981 -185, La Plata River <br />Bridge Renovation <br />Dear Mr. Czapla, <br />This letter and the enclosed attachments comprise Wildcat Mining Corporation's (WCM) submittal of its <br />3rd Technical Revision (TR3) to the May Day Idaho Mine Complex Permit No. M- 1981 -185. TR3 is <br />focused on renovation of the bridge crossing the La Plata River, and is being provided to DRMS in <br />accordance with WCM's October 11, 2011 response to Adequacy Issue No. 7 from Tim Caizer's <br />September 28, 2011 Memorandum to Wally Erickson. <br />On January 19, 2012 WCM performed geotechnical drilling of the fill material behind both bridge <br />abutments (drilling contractor: Enviro -Drill of Farmington, New Mexico). The drilling was logged by <br />WCM consultant, David McClay, P.E. The logs for each drilling location are included with this <br />submittal. The drilling of the west abutment, designated as BRB -01, consisted of three hollow stem auger <br />boreholes at the edges and center of the abutment. All three borings reached refusal at 3.0 feet from the <br />surface; the center borehole is represented by the BRB -01 drill log provided with this submittal. The 3 <br />feet of augured fill above refusal consists of very dense and angular, coarse to fine sandy gravel, <br />classified as a well - graded gravel according to the ASTM Unified Soil Classification System (USCS) <br />(ASTM D2487 -11). Due to the high compaction of the fill and the shallow depth to refusal at BRB -01, <br />blow counts exceeded the maximum measurement of 50 blows per foot. <br />Drilling of the east abutment, designated as BRB -02, consisted of three hollow stem auger boreholes at <br />the edges and center of the abutment. The north- outside and center boreholes reached refusal at 2.0 feet, <br />and the south - outside borehole reached refusal at 4.0 feet; the south - outside borehole is represented by the <br />BRB -02 drill log provided with this submittal. The 2.0 to 4.0 feet of augured fill consisted of very dense, <br />silty- gravely sand classified as well - graded sand according to the USCS. Similar to BRB -01, due to the <br />high compaction of the fill and the shallow depths to refusal at BRB -02, blow counts exceeded the <br />maximum measurement of 50 blows per foot. <br />During Spring 2012, WCM engaged Wilson Structural Engineering (WSE) of Durango, Colorado to <br />assess the structural integrity of the bridge, as is, and to develop a renovation plan for the bridge in order <br />to safely accommodate a loaded tandem dump truck with a gross weight of 54,000 pounds. On May 24, <br />WSE provided WCM with a Bridge Renovation Plan, included with this submittal, specifying the <br />following: <br />1. Extension of the existing steel abutments by welding a 3/8" by 6" triangular gusset plate parallel <br />to the web the abutments, spanning new w 1 2x53 steel beems on the outer edges of the abutments, <br />then welding and bolting a 3/8 "x12" cap plate to the underside of the new steel beams where the <br />they rest on the welded gussets. <br />2. Reinforcement of the existing steel abutments by adding 3/8" web stiffners under the centerline of <br />each beam from the top to the bottom of each abutment, and welding and anchoring 3/8" steel <br />plate lying flat against the concrete footing of the abutments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.