My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-07-12_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1995-07-12_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 10:36:16 AM
Creation date
6/29/2012 7:02:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
7/12/1995
Doc Name
Proposed Voluntary Remediation Projects- Animas River Basin.
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4 <br /> London Mme Portals <br /> Page 3 <br /> Geology as well as the Water Quality Control Division. <br /> The report will include activities to date as well as planned activities for future years work. <br /> Budget <br /> SGC will fund this project. <br /> Remedial Goals and Objectives <br /> Reduction of low pH, metal laden waters flowing into Burrows Creek by: <br /> 1) Restoring hydrologic regime to near premining <br /> conditions. <br /> 2) Reduction of acidity in the headwaters by isolating or limiting abilities of waters to react <br /> with pyrite and other sulfide minerals. <br /> 3) Reduction of exposure to waste material by snowmelt, <br /> rainwater. <br /> 4) Visually reclaim area to acceptable standards. <br /> Contingency Plans <br /> Should the concept of hydraulic seals not be practical after engineering studies, SGC will <br /> consult with the Division of Minerals and Geology for other possible solutions. If an acceptable <br /> system can be arrived at, SGC will install such a system. <br /> Legal Right to Enter and Conduct Activities <br /> SGC has not contacted the property owner at this time. Contact will be initiated when SGC <br /> and WQCD have reached substantial agreement on offsite remediation projects. No work will <br /> commence until proper permission is granted. <br /> S ed by unnyside Id Corporation <br /> Willi . Go h d <br /> Resid nt Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.