Laserfiche WebLink
Working Draft 7/14/95 <br /> Confidential Page 8 <br /> 1 <br /> the Water quality standard. <br /> 2 <br /> b. Does all data meet or exceed control chart criteria?: All data will be used in the <br /> 3 <br /> assessment of water quality at the reference point regarding whether the control chart criteria have been met. If <br /> 4 <br /> the control chart criteria are not met, the next question is posed. If the control chart criteria are met (Appendix <br /> D lists the control charts, the process for determining compliance), the process proceeds toward permiti +sir:: <br /> 6 :::::::.•::•:: i•:.' .: 4.:i::ni++: n. .. :: :: '•. ....... <br /> :': ':..:::;: .. .. ...... <br /> ... -::::... <br /> . . n . <br /> #�; :�ak�n ''trers4iz�::�€pX ;�ix'��-.:n�u:: : <br /> 8 ::. .:::.. ........ <br /> c. Is non-compliance caused by others?: If the control chart criteria are not met the cause is <br /> 9 <br /> investigated as outlined in Appendix F.. If SGC can establish that the non-compliance is caused by some other <br /> 10 <br /> entity's action, the process proceeds toward permit release. SGC must follow the monitoring plan in item?? an <br /> 11 <br /> the criteria out lined in Appendix F or such determination can not be made. If SGC can not establish that it is <br /> 12 <br /> caused by some third party, SGC and WQCD decide whether it is feasible to continue(see 7, below). <br /> 13 <br /> d. In the event of a failure of"compliance assessment, short term contingency measures will <br /> 14 <br /> be implemented... due diligence test... <br /> 15 <br /> 16 <br /> VIII. IS IT FEASIBLE TO CONTINUE? <br /> 17 <br /> Based on failed compliance assessment, SGC and WQCD will decide whether it is feasible to continue. <br /> 18 <br /> x::h t c ari us b 11 csl :**). If it is decided that it is not feasible to continue, <br /> 19 <br /> SGC must re-establish the status quo as provided in section???. If it is decided to continue, more mitigation <br /> 20 i <br /> projects will be done (see N, below). <br /> 21 <br /> 22 <br /> IX. PREMATURE END OF AGREEMENT <br /> 23 <br /> 24 <br /> If SGC or WQCD decide that continuation of the agreement is not in their best interest as outlined in <br /> 25 <br /> ???t, the following procedures will be follow: <br /> 26 <br /> 27 <br /> 1. Notification ::riec : o c11 :< � ais 1"tr.rtctiit' ti :ti tt : t# :;St::;::;: �t <br /> 28 <br />