Laserfiche WebLink
Working Draft 7/14/95 <br /> Confidential Page 6 <br /> 1 <br /> 2 after completion of the "A" List projects, and a joint WQCD/ SGC decision to continue with the agreement (see <br /> 3 Part VIII, below), SGC will do the projects included on the "B" List. SGC will submit detailed (?) reclamation <br /> 4 plans which at a minimum meet the criteria outlined in appendix c to the WQCD regarding what will be done at <br /> i <br /> .. .... <br /> ..........each site. Or Won-Wh . <br /> 5 o i <br /> e X <br /> 14M. : 0 <br /> rfid - <br /> 6 <br /> 7 <br /> 8 c. Other Contingency Measures for obtaining final compliance.: In the event that after a <br /> 9 failed compliance assessment(see Part VII, below), after completion of the" B"List projects, and ajoint <br /> 10 WQCD/ SGC decision to continue with the agreement (see Part VIII, below), SGC will do the projects included <br /> 11 as "Other contingency measures". SGC will submit detailed (?) reclamation plans which at a minimum meet the <br /> 12 criteria outlined in appendix c to the WQCD regarding what will be done at each site <br /> 13 <br /> 14 4. Cement Creek: At the same time that the valves are closed on the American Tunnel property <br /> 15 line plug and the Terry Tunnel plug, SGC will divert Cement Creek and begin to treat the diverted water to the <br /> . .... . <br /> 16 <br /> full hydraulic capacity of the treatment plant. <br /> n -W .. .. ....OMM eo <br /> T S......... <br /> t <br /> .... ....... .... ...... <br /> M* <br /> pqw: 0 t .4t on 6rt at. . . V , <br /> 17 ........ <br /> t_.g atiOnsfe <br /> ..... .. ... goj <br /> 18 <br /> 19 a. Treatment of the combined remaining discharge of American tunnel and Cement Creek <br /> 20 will meet those standards as required to conform to federal and state water quality requirements. ??? <br /> 21 b. After initial mine pool equilibrium is reached, external portal plug equilibrium is reached, <br /> 22 and there is compliance with the control chart criteria, and compliance with water quality standards with <br /> 23 treatment is predicted, treatment of the portion of Cement Creek that has been diverted through the treatment <br /> 24 plant will cease upon agreement between the Division and SGC. <br /> 25 C. The system to treat Cement Creek shall be maintained in working order until permit <br /> 26 release is provided. No third party will be allowed to <br /> 27 d. Upon successful "compliance assessment, two years after the cessation of treatment, the <br /> 28 treatment facility will be dismantled and the treatment ponds and surface disturbances reclaimed as required by <br />