Laserfiche WebLink
i14:. MINERAL RESOURCES TEL:1-303-239-3T99 Mar 12 96 11 :07 III IIIIIIIIIIIIIIII <br /> 999 <br /> r <br /> ' @lIOXe a� OOIOellfi'/ <br /> i ocat DRc�ss �ltDalt <br /> ' �N@tlese and oeemsete <br /> General Atter oaipleinq the various remediation and bulkhead <br /> t *@to@whatlLintthe f expeatsd obangs La sino loading at <br /> elplefr"GePart iv.a., what is the significance of the statement 02M Reforenss <br /> P. It lout will aft be a pmnRit compliance poiat•P <br /> Fact V.9.a., Welther the coaoont decree or draft permits d*ocrlbe the <br /> p.lf "additional hidranlio seals downstream of the yroposty <br /> lino'. What s the function of these seals, whom will <br /> they be placed, what are the expectod outcome of thoir <br /> QisoseRmt, bow will the deelsion to VMood vith gUoomont <br /> be made, what happens it owner doesn't apprevel <br /> Part VI.20.b., why are only four site@ a?A not all @itee on a and a lists <br /> p. is n onita:adt <br /> 'Part 7tlx.36.0 will there bo publio votioe of amendwents to consent <br /> p. 31 ' • • decroof <br /> Appondix a why is it that most of the mitigation projects will benefit <br /> wat,or quality daring high flow ovens? water quality <br /> problems ar* most severe daring low flowa <br /> hppsndtx o "at are.the oriteria against whisk sao*o@@"l Perrosmanoe <br /> will be sroasured in the mitigation projects! <br /> Appendix of a- why is sec only evaluating Hats; flows end designiaq a <br /> z(s), y- i:b ; treatment system! Why not require SW to complete a water <br /> te"tmeat syst"? <br /> Appendix W, a- Why does the consent doors* only require a bulkhead at the <br /> 3, p. 3.b Columbas Hine Portal whereas the peaait requires both <br /> bulkhead and wine waste relocation! <br /> PAX TRANSMITTAL •Maw- <br /> ,- 4 a ,O t, <br /> ' •-� - 39 0 2 9 - <br /> -�� <br /> i <br />