Laserfiche WebLink
Mitigation Work Plans <br />Additional Information <br />Page 4 <br />Addition of alkaline material, as well as mixing and blending will <br />be performed at the disposal site with the equipment used for <br />placement. In most cases, the material will be placed in lifts. <br />The material will be placed, then the appropriate amount of <br />alkaline material will be spread across the top of the lift. This <br />alkaline material will be worked into the lift by blending and <br />mixing with the knock down equipment. This may result in a deposit <br />that bonds from a higher pH at the top to a lower pH below. This <br />is viewed as being acceptable because any percolating water through <br />the material will serve to equalize and distribute any inequities <br />in the initial placement of the alkaline material. <br />Please contact me if the above does not adequately address your <br />requests for additional information or if you have any questions. <br />SGC looks forward to working closely with DMG to complete these <br />projects. <br />cc: Sarah Johnson <br />Bill Goodhard <br />Resident Manager <br />