My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-03-14_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-03-14_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2021 3:28:41 PM
Creation date
6/29/2012 7:01:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
3/14/1996
Doc Name
Mitigation Work Plans- Additional Information
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Work Plans <br />Additional Information <br />Page 2 <br />3. Surface Mill Tailings at Eureka <br />The reason for not planning to establish vegetation as part of <br />the project was based on a comparison to the land surrounding <br />the remediation site. It is either a barren talus slope or an <br />active alluvial fan. SGC proposes that the post remediation <br />land use be similar to that of the surrounding area. This <br />type of observation can probably be made during the first site <br />inspection. SGC will advise DMG when the sedimentation <br />controls are in place and upon project completion so that DMG <br />can schedule inspections for the appropriate times. <br />4. Gold Prince Mill Tailings and Waste Dump <br />SGC will inform DMG of progress on this project and of SGC's <br />selection of a disposal site and availability of soil material <br />for capping the material so DMG can schedule a site inspection <br />prior to starting the waste material removal process. <br />Attached is a copy of the old mine workings map on which SGC <br />bases its conclusion on that water will back up approximately <br />15 feet before dropping into the Sunnyside Mine Pool resulting <br />in only minor hydrostatic forces on the bulkhead. The Gold <br />Prince portal is definitely higher than the Lake Emma outlet. <br />SGC has not evaluated this connection but will attempt to. If <br />the status of this connection cannot be confirmed by SGC, a <br />pressure gauge will be installed and monitored until the <br />reading stabilizes to provide assurance that the integrity of <br />the bulkhead is not compromised. <br />5. Longfellow Koehler <br />SGC will inform DMG of progress <br />selection of a disposal site, <br />feasibility or plans for run on <br />can schedule a site inspection <br />material removal process. <br />6. Boulder Creek Tailings <br />on this project and of SGC's <br />availability of soils and <br />controls and ditches so DMG <br />prior to starting the waste <br />SGC will update DMG on project status and upon completion so <br />that an inspection can be scheduled to determine whether the <br />selected performance standards have been met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.