My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-06_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-05-06_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 10:20:53 AM
Creation date
6/29/2012 7:01:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
5/6/1996
Doc Name
Permit Issued
From
CDPHE-WQCD
To
Sunnyside Gold Corp
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part II <br /> Page No. 16 <br /> Permit No.: CO-0044768 <br /> (4) Allowing for a transfer in ownership or operational control of a facility where the Division determines that no <br /> other change in the permit is necessary,provided that a written agreement containing a specific date for transfer <br /> of permit responsibility,coverage and liability between the current and new permittees has been submitted to <br /> the Division;or <br /> (5) Changing the construction schedule for a discharger which is a new source,but no such change shall affect a <br /> discharger's obligation to have all pollution control equipment installed and in operation prior to discharge;or <br /> (6) Deleting a point source outfall when the discharge from that outfall is terminated and does not result in <br /> discharge of pollutants from other outfalls except in accordance with permit limits. <br /> f. When a permit is modified,only the conditions subject to modification are reopened. If a permit is revoked and reissued, <br /> the entire permit is reopened and subject to revision and the permit is reissued for a new term. <br /> g. The filing of a request by the permittee for a permit modification,revocation and reissuance or wirn:nation does not stay <br /> any permit condition. <br /> h. All permit modifications and reissuances are subject to the antibacksliding provisions set forth in 6.11.0(5)through(9). <br /> 6. Oil and Hazardous Substance Liability <br /> Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any <br /> responsibilities,liabilities,or penalties to which the permittee is or may be subject to under Section 311 (Oil and Hazardous <br /> Substance Liability)of the Clean Water Act. <br /> 7. State Laws <br /> Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any <br /> responsibilities,liabilities,or penalties established pursuant to any applicable State law or regulation under authority granted <br /> by Section 510 of the Clean Water Act. <br /> 8. Permit Violations <br /> Failure to comply with any terms and/or conditions of this permit shall be a violation of this permit. The discharge of any <br /> pollutant identified in this permit more frequently than or at a level in excess of that authorized shall constitute a violation of <br /> the permit. <br /> 9. Property Rights <br /> The issuance of this permit does not convey any property or water rights in either real or personal property,or stream flows, <br /> or any exclusive privileges,nor does it authorize any injury to private property or any invasion of personal rights,nor any <br /> infringement of Federal,State or local laws or regulations. <br /> 10. Severability <br /> The provisions of this permit are severable. If any provisions of this permit,or the application of any provision of this permit <br /> to any circumstance,is held invalid,the application of such provision to other circumstances and the application of the <br /> remainder of this permit shall not be affected. <br /> 11. Renewal Application <br /> If the permittee desires to continue to discharge,a permit renewal application shall be submitted at least one hundred eighty <br /> (180)days before this permit expires. If the permittee anticipates there will be no discharge after the expiration date of this <br /> permit,the Division should be promptly notified so that it can terminate the permit in accordance with Part II.B.5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.